Where clean energy meets steady returns
With TOKI, every MWh works for you. Effortless, transparent, and always under control.

From stable revenues to sustainable growth
Predictable income with fair prices
Choose the model that fits your scale and stage - standard tariffs, direct sales, or a PPA. Enjoy predictable revenues and clear terms.
Lower balancing costs
Join Bulgaria’s largest renewable aggregator and benefit from professional forecasting. Reduce imbalance costs and maximize the value of your production.
Access to new markets and strategies
Sell your energy at fixed or market-based prices, trade through aggregation, or participate in the balancing market—with flexibility and control tailored to your profile.
A platform for full control and sustainable growth
Track everything online—from production and invoices to contracts and reports. Get real-time data, expert forecasts, and actionable advice to grow sustainably.
Energy trading solutions tailored to the scale of your business
Standard tariffs
The most familiar and convenient model for selling electricity on the free market, with a fast and simple switching process.


“Share energy”
Direct sales to one or more business consumers at a fixed price.
PPA
Long-term agreements between producers and business consumers.
.avif)
The power of partnership
From rooftop installations to industrial solar parks – with equal access to services,
regardless of their scale.
2000+
110+ MW
1.5 GW
With TOKI, energy management is easier

Simple onboarding process
Smart, intuitive control

Frequently asked questions
For existing plants, the joining period is from the 1st to the 10th of the month, and if the process with the Distribution System Operator (DSO) is successful, the contract takes effect on the 1st of the following month.
If the plant is new or under construction, you must provide proof that it has been energized. We will then submit a request to the DSO to join the balancing group, and they will inform us of the plant’s connection timelines.
For any change - such as a change in legal form, name, address, etc. - you only need to notify us at producers@toki.bg.
Please send a notification to vei.info@toki.bg as soon as possible after the outage occurs. This will allow us to update forecasts and optimize the management of the balancing group.
1. For an already operating RES plant (regardless of the grid operator):
- Provide a Protocol for produced electrical energy for any month.
2. For newly completed RES plants under Art. 103a of the PTEE (depending on the grid operator):
If connected to ERM Zapad EAD:
- Certificate of access to the electricity distribution grid is required and
- Order for the final energization of the facility
If connected to ERP Sever AD:
- Certificate of access to the grid
- Appendix 3 – List of commercial metering devices
If connected to ER Yug EAD:
– Statement of findings under Art. 147, para. 1 of the ZUT, confirming the facility’s suitability
– Protocol for connecting the power plant in parallel with the distribution grid and commissioning